top of page

SURVEYING

DSCN0890.JPG

C&C staff perform topographic and route surveys for roadway projects.  One recent example is our survey of a four-mile-long segment of State Route 2 in Gill and Greenfield, MA.  Key project details include:

  • daytime on road survey with local Police details.

  • existing conditions/topographic survey of roadway and roadside.

  • locate utilities, poles, signage, hydrants, etc.

  • locate property lines.

  • research utilities' record plans.

  • develop project base plan.

  • MassDOT Geodetic controls.

DTX.png

C&C survey staff have developed complex easement and taking documentation for numerous projects. One example shown above is the underground easements at Downtown Crossing Red Line Station for the MBTA. Key project details include:

  • station survey 3 levels below grade.

  • accommodate existing BWSC and City easements below grade.

  • accommodate existing property lines for commercial buildings.

  • develop below grade easements for construction of proposed elevators.

  • extensive rounds of coordination with MBTA Legal and elevator designers.

Picture1.jpg

C&C survey staff completed the full host of survey related services for our MassDOT project to design the replacement of a deficient bridge over the Little River in Westfield, MA.

Key project details include:

  • full existing conditions/topographic survey per MassDOT Survey Manual.

  • utilities research.

  • prepare project base plan.

  • research property deeds and records.

  • prepare easements and takings.

  • Preliminary and Final Right of Way Plans.

  • new State Highway Layout.

bottom of page